Proceedings: Oosterweel link infrastructure works - reinforced soil embankments

Proceedings: Oosterweel link infrastructure works - reinforced soil embankments

On 16 May, BGS organised the workshop'Infrastructure works Oosterweel link - reinforced ground embankments'.

This was on the programme:

  • ‘Belgian Geosynthetics Society - Remblais renforcés’ - BGS (Nicolas Denies)
  • Infrastructural works Oosterweel link - Challenges of large projects - LANTIS (Sven Somers)
  • Reinforced soil abutment design of Stadsbader in the project - Construction of the G0 3 of Left Bank - STADSBADER (Thomas Lenders)
  • Design of the reinforced soil G0 3 - ARCADIS NEDERLAND (Jan Ruigrok)
  • Direct bridge abutment design with terramesh solutions - Oosterweel G03 - Texion and Maccaferri (Francesco Masola)
  • Monitoring of structures and systems with optical fibres - WTCB (Gust Van Lysebetten)
  • Monitoring ‘fibre optique’ du remblai renforcé G03 - CSTC et Vlaamse Overheid (Nicolas Denies & Jan Couck)
  • Projet SOLRENF - Dimensionnement des remblais renforcés - Nouvelle génération d'Eurocodes - CSTC (Nicolas Denies)

View the proceedings here.